Menu Close

Volunteers Build New Bridge and Boardwalk at Camp

Fourteen volunteers worked two days a week over a three-month period to build two new structures at Camp Hanover. The first, a 960-square foot boardwalk along the lake waterfront, complements the floating dock built last year. The second project is a 74-foot bridge to complete Pearson’s Trail, an accessible path connecting the lake and Wise Lodge. The bridge required six steel beams, each weighing 1,100 pounds.

The boardwalk and bridge complete the connection of Pearson’s Trail to Hadder Way, the access road to the lake built early this year. The two projects were led by Brown Pearson, moderator of the presbytery’s Disaster Relief Ministry and a member at Southminster Church.

camp boardwalk (5)
camp bridge IMG_0568 (2)